MCP HeartbeatTHE MCP OBSERVATORY
Public workspace

Explore

Evidence for your next connection.

Independent measurements of remote MCP servers. Every observation has a timestamp.

Read-only probes

MCP server · Data access / search

RemedyBridge free tools for tenants

Free tools for UK tenants: Awaab's Law and complaint deadlines, repair letters, housing help search

Checks passed
13 / 22

1 failed · 8 not measured

Median response
449 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
6

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Outdated check

Last connection measurement is over 24 hours old. Current availability is unknown.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
400
Publisher identityCan the publisher be traced to its source?
312

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 449 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-11-25, serverInfo.name remedybridge-tools.

  • Pass
    Lists tools

    tools/list returned 6 tools.

  • Pass
    Current protocol

    Negotiated 2025-11-25. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 449 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 449 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Pass
    Parameters documented

    23 of 23 parameters have a description (100%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Pass
    Website matches publisher

    The website host matches the reverse-domain namespace.

  • Fail
    Source repo linked

    No repository URL is on file.

  • Not measured
    Repo owner matches

    This namespace is not an io.github login, so the owner comparison does not apply.

  • Pass
    Recently updated

    Updated 2026-10-28T18:17:45.664085Z, within 180 days.

  • Not measured
    Open-source licence

    No GitHub repository to ask about a licence.

Start using RemedyBridge free tools for tenants

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http remedybridge-free-tools-for-tenants https://remedybridge.co.uk/mcp/

Capabilities

Tools 6

build_evidence_checklist

Lists the evidence worth gathering about disrepair in a rented home, for the problems and the landlord given: what everyone should keep (dated photos, copies of every report, reference numbers, appointments and complaint letters), then what each problem needs and what each kind of landlord’s case needs. Problems: "damp" (damp or mould), "leak" (leaks or water ingress), "heating" (heating or boiler), "electrics" (unsafe electrics), "windows" (windows or doors), "pests" (pests or vermin), "structural" (structural or plaster). It asks for no personal details.

Discovered
calculate_landlord_complaint_deadlines

Works out when a council or housing association in England must acknowledge and answer a tenant’s complaint under the Housing Ombudsman’s Complaint Handling Code (2024): at stage 1, acknowledge within 5 working days and respond within 10 working days of acknowledging (paras 6.2 to 6.4); at stage 2, acknowledge within 5 and respond within 20 (paras 6.11 to 6.15), each with the longest extension. It counts working days, leaving out weekends and bank holidays in England and Wales; a complaint received at a weekend or on a bank holiday counts from the next working day. Give the dates the landlord acknowledged or answered, if it has, to see whether each was on time. It says when the Code does not usually apply (private landlords, Wales). It never says what a complaint will achieve.

Discovered
calculate_pre_action_protocol_timetable

Works out the timetable the Pre-Action Protocol for Housing Conditions Claims (England) sets after a tenant’s letter of claim: the letter is treated as received two days after its date, the landlord should reply within 20 working days of that (paras 6.2 and 7.2(a)), the inspection should follow within 20 working days of the reply (para 7.4(a)), the expert’s report or agreed schedule within 10 working days of the inspection (para 7.4(b) and (d)), and the landlord’s full response within 20 working days of receiving it (para 6.3). Give the later dates as they happen to see each next date and whether each step was on time. It counts working days, leaving out weekends and bank holidays in England and Wales. The protocol calls these long stops, and they can be changed by agreement (para 9). Wales has its own protocol, with the same periods for the reply, the inspection and the report.

Discovered
check_awaabs_law_deadlines

Works out the dates Awaab’s Law gives a council or housing association in England (the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025, SI 2025/1042) to deal with damp or mould: investigate it, give the tenant a written summary, finish any safety work and start any further work. It counts working days from the day after the landlord found out, leaving out weekends and bank holidays in England and Wales, and says whether each date has passed. For an emergency hazard it gives the 24-hour rule; for other hazards it gives the position on Awaab’s Law Phase 2 from the site’s legal register. It says when Awaab’s Law does not apply (private landlords, Wales, shared ownership and long leases). It does not decide whether a hazard is significant, and a missed date is a dated failure, not an entitlement to anything.

Discovered
get_repair_letter_template

Gives the text of a letter for a tenant to send their landlord, with [bracketed] gaps to fill in: "first-report" to report a repair in writing for the first time, "chaser" when it was reported and nothing has happened, "complaint" to make a formal complaint under the landlord’s complaints procedure (citing section 11 of the Landlord and Tenant Act 1985 in England, or sections 91 and 92 of the Renting Homes (Wales) Act 2016 in Wales), or "awaabs-law" to ask a council or housing association in England to deal with a hazard under Awaab’s Law. The Awaab’s Law letter is given only to a tenant of a council or housing association in England with a tenancy (not a licence, shared ownership or a long lease). It never takes the tenant’s name, address or details: fill in the gaps with them. The letters state facts and make a request; they promise no outcome.

Discovered
search_housing_repair_help

Answers tenants’ questions about repairs, damp and mould and disrepair in rented homes in England and Wales, from RemedyBridge’s published guides: what a landlord must repair and how quickly, Awaab’s Law, section 11 of the Landlord and Tenant Act 1985 and fitness for human habitation, reporting repairs, landlord complaints and the Housing Ombudsman, free helplines and who each one is for, Environmental Health and HHSRS, withholding rent, eviction after a complaint, the pre-action protocol and evidence. It searches the quick answer and the questions and answers of every guide, and a glossary of 54 housing terms, and returns each answer with the link to its page. Use it for "what is", "who is responsible", "how long" and "what can I do" questions. It does not assess anyone’s situation.

Discovered

Recent measurements

Probe history

View status
Latest stored probes. Raw probe rows are kept for 14 days.
CheckedResultResponseTools
Connected449 ms6