MCP HeartbeatTHE MCP OBSERVATORY
Public workspace

Explore

Evidence for your next connection.

Independent measurements of remote MCP servers. Every observation has a timestamp.

Read-only probes

MCP server · Data access / search

Conversion Ledger (RAD)

HUD RAD conversions, housing authority records, 2026 RAD rents, program facts and debt sizing.

Checks passed
12 / 22

2 failed · 8 not measured

Median response
200 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
6

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Outdated check

Last connection measurement is over 24 hours old. Current availability is unknown.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
310
Publisher identityCan the publisher be traced to its source?
312

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 200 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-06-18, serverInfo.name conversion-ledger.

  • Pass
    Lists tools

    tools/list returned 6 tools.

  • Pass
    Current protocol

    Negotiated 2025-06-18. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 200 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 200 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Fail
    Parameters documented

    24 of 31 parameters have a description (77%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Pass
    Website matches publisher

    The website host matches the reverse-domain namespace.

  • Fail
    Source repo linked

    No repository URL is on file.

  • Not measured
    Repo owner matches

    This namespace is not an io.github login, so the owner comparison does not apply.

  • Pass
    Recently updated

    Updated 2026-11-01T22:30:07.009807Z, within 180 days.

  • Not measured
    Open-source licence

    No GitHub repository to ask about a licence.

Start using Conversion Ledger (RAD)

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http conversion-ledger-rad https://rad.loans/mcp

Capabilities

Tools 6

get_financing_quote_link

The page where a housing authority, developer or owner can request a financing quote for a RAD conversion, Section 18 blend, PRAC or Component 2 conversion, or a refinance of a converted property, from Janover Capital LLC. Optional prefill. Returns a link only; it submits nothing.

Discovered
get_housing_authority

A public housing authority's RAD record: closed conversions (units, PBV/PBRA, tax credits, FHA), deals between CHAP and closing, remaining public housing units and their weighted 2026 RAD rent, and its conversions list. Give the HUD PHA code (IL002), the rad.loans page URL, or name + state.

Discovered
get_rad_program_facts

The current state of RAD law and terms, each with its primary source: permanence and the 555,000-unit cap (Public Law 119-101 section 212, July 2026), the governing notices, PBV and PBRA contract terms, FHA premium and underwriting, the 2026 LIHTC bond test, agency terms.

Discovered
get_rad_rents

HUD's 2026 RAD contract rent for unconverted public housing projects, with the PBV (110% FMR) and PBRA (120% FMR) caps, HUD's 90/10, 60/40 and 30/70 blend rent estimates, the utility allowance and 2024 operating fund and tenant rent per unit month. Give a PIC project number, or project/pha name with state.

Discovered
search_conversions

RAD public housing conversions from HUD's RAD Resource Desk export, newest first: project, housing authority, state, PBV or PBRA, units, status, CHAP and closing dates, tax credits (4%/9%), FHA insurance and Section 18 blend flags, with each housing authority's rad.loans page.

Discovered
size_rad_debt

First-mortgage sizing for a RAD property under FHA 223(f), FHA 221(d)(4), Freddie Mac (HUD Section 8), Fannie Mae Affordable Housing Preservation: the loan each execution supports by coverage and by loan ratio, which test binds, and annual debt service including FHA's 0.25% premium. Defaults come from HUD Mortgagee Letter 2025-03, the MAP Guide, 90 FR 45789 and the Fannie Mae and Freddie Mac term sheets, with HUD's median FHA note rates. Same math as rad.loans/tools/rad-debt-sizer/. A sketch, not a loan offer.

Discovered

Recent measurements

Probe history

View status
Latest stored probes. Raw probe rows are kept for 14 days.
CheckedResultResponseTools
Connected200 ms6