Findings on what compounds and supplements do in the body, with evidence strength, quote and paper.
- Passed: Handshake
- Passed: Tools listed
- Passed: Updated recently
Median latency 699 ms · Last checked
Explore
Evidence for your next connection.
Independent measurements of remote MCP servers. Every observation has a timestamp.
Read-only probesMCP server · Other
BNG income and cost estimates for land in England, GB grid headroom and planning history
2 failed · 8 not measured
Median of successful probes over 7 days
Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.
Tool definitions returned by this server
Independent monitoring
Outdated check
Last connection measurement is over 24 hours old. Current availability is unknown.
Last checked| Test area | Passed | Failed | Unmeasured |
|---|---|---|---|
ConnectionCan a client connect and discover tools? | 5 | 0 | 0 |
Reliability & speedDoes it respond consistently and quickly? | 0 | 0 | 4 |
Access & authenticationWhat is required to use this server? | 1 | 0 | 2 |
Tool qualityAre the tool definitions usable by an agent? | 3 | 1 | 0 |
Publisher identityCan the publisher be traced to its source? | 3 | 1 | 2 |
Unmeasured means there is not enough evidence to decide. How these checks work
Start using LandBNG
Choose your client, copy the configuration, then enable the server in your client’s MCP settings.
Run this command in your terminal, then restart Claude Code.
Claude Code
claude mcp add --transport http landbng https://landbng.uk/mcpCapabilities
Check nearest UK electricity Distribution Network Operator (DNO) grid connection headroom for a location: generation/demand headroom (MW/MVA), RAG status, voltage, and a combined BNG+grid siting signal. Covers all of Great Britain (England/Scotland/Wales), not just England. Free, no key.
DiscoveredFind planning applications near a UK location, via UK PlanIt's public aggregator (over 400 UK planning authorities). Free, no key. radius_km must be between 0.1 and 5.0.
DiscoveredEstimate the cost of meeting England's mandatory 10% biodiversity net gain requirement for a development scheme of `scheme_ha` hectares, across 3 procurement routes (off-site habitat bank mosaic, off-site grassland/ heathland, statutory biodiversity credits, priced per unit at two Defra credits per unit), and the units to buy from a gain site in the same, a neighbouring or a further authority (spatial risk multiplier 1.0 / 0.75 / 0.5, with this point's authority names). land_type: brownfield / arable / improved / semi_improved / mixed. England only. Free, no key.
DiscoveredEstimate 30-year lump-sum BNG income (LOW/MID/HIGH) for dedicating `area_ha` hectares of an England parcel to biodiversity net gain habitat creation, from LandBNG planning assumptions per habitat capped at the Defra statutory credit price; local factors (flood zone, SSSI, Green Belt, Ancient Woodland, AONB, Agricultural Land Class, nearby NSIP projects and how many fall under mandatory BNG) are listed, not priced. England only. Free, no key.
DiscoveredRecent measurements
| Checked | Result | Response | Tools |
|---|---|---|---|
| Connected | 128 ms | 4 |