Findings on what compounds and supplements do in the body, with evidence strength, quote and paper.
- Passed: Handshake
- Passed: Tools listed
- Passed: Updated recently
Median latency 699 ms · Last checked
Explore
Evidence for your next connection.
Independent measurements of remote MCP servers. Every observation has a timestamp.
Read-only probesMCP server · Other
How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.
3 failed · 8 not measured
Median of successful probes over 7 days
Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.
Tool definitions returned by this server
Independent monitoring
Check failed
The last measured handshake failed. Open the listing for evidence.
Last checked| Test area | Passed | Failed | Unmeasured |
|---|---|---|---|
ConnectionCan a client connect and discover tools? | 4 | 1 | 0 |
Reliability & speedDoes it respond consistently and quickly? | 0 | 0 | 4 |
Access & authenticationWhat is required to use this server? | 1 | 0 | 2 |
Tool qualityAre the tool definitions usable by an agent? | 3 | 1 | 0 |
Publisher identityCan the publisher be traced to its source? | 3 | 1 | 2 |
Unmeasured means there is not enough evidence to decide. How these checks work
Start using Watt Street — US grid, interconnection queue and data center power
Choose your client, copy the configuration, then enable the server in your client’s MCP settings.
Run this command in your terminal, then restart Claude Code.
Claude Code
claude mcp add --transport http watt-street-us-grid-interconnection-queue-and-data-center-power https://api.wattstreet.net/mcpCapabilities
Credits remaining on the calling key, and how to top up without a human.
DiscoveredFull grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology.
DiscoveredCluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it has been checked — a date marked unconfirmed came from a secondary source and has not been verified against the authority's own tariff. Do not present an unconfirmed date as a commitment.
DiscoveredLarge-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most cannot be attributed to data centers or any other industry. Does not yet include ERCOT, PJM, MISO, CAISO, SPP or ISO-NE. Filter by state or size.
DiscoveredGeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses.
DiscoveredTracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations.
DiscoveredSearch 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome.
DiscoveredRecent measurements
| Checked | Result | Response | Tools |
|---|---|---|---|
| Connected | 96 ms | 7 |