Draw Schedule: multifamily construction financing

Apartment construction loans: HUD vs bank vs fund rules, sizing, Census starts and build times.

Checks passed
13 / 22

1 failed · 8 not measured

Median response
154 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
4

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Outdated check

Last connection measurement is over 24 hours old. Current availability is unknown.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
400
Publisher identityCan the publisher be traced to its source?
312

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 154 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-11-25, serverInfo.name multifamilyconstruction-loan.

  • Pass
    Lists tools

    tools/list returned 4 tools.

  • Pass
    Current protocol

    Negotiated 2025-11-25. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 154 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 154 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Pass
    Parameters documented

    15 of 15 parameters have a description (100%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Pass
    Website matches publisher

    The website host matches the reverse-domain namespace.

  • Fail
    Source repo linked

    No repository URL is on file.

  • Not measured
    Repo owner matches

    This namespace is not an io.github login, so the owner comparison does not apply.

  • Pass
    Recently updated

    Updated 2026-11-01T23:07:27.407356Z, within 180 days.

  • Not measured
    Open-source licence

    No GitHub repository to ask about a licence.

Start using Draw Schedule: multifamily construction financing

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http draw-schedule-multifamily-construction-financing https://multifamilyconstruction.loan/mcp

Capabilities

Tools 4

compare_construction_options

Side-by-side rules for financing apartment construction four ways: HUD 221(d)(4), a bank construction loan, a debt fund and 4% tax credits with bonds. For each: maximum loan size and the rule behind it, rate type, term, coverage test, extra costs and process, with the regulation or HUD letter cited.

Discovered
get_build_timeline

Census Survey of Construction averages for apartment buildings: months from permit to start and from start to completion, by U.S. region and building size (5-9, 10-19 or 20+ units), for one completion year with the ten-year trend, plus what the build length means for HUD upfront MIP and construction interest.

Discovered
get_construction_market

Latest U.S. apartment construction numbers for 5+ unit buildings from the Census Bureau (starts, permits, units under construction, completions; seasonally adjusted annual rate, with year-ago and the pipeline peak) and the Federal Reserve's loan officer survey on construction and multifamily lending standards and demand, plus 30-day SOFR. Optional monthly history.

Discovered
size_construction_loan

Runs the site's construction loan sizer on your project: the HUD 221(d)(4) loan (lower of 87%/90% of cost and the 1.15/1.11 coverage test, with HUD's construction-interest estimate and upfront MIP), the bank regulatory ceiling (80% of value and 15%-of-value HVCRE equity, plus your bank's loan-to-cost if given) and, if you give its loan-to-cost, a debt fund. Returns loan, binding limit, equity needed and interest.