Findings on what compounds and supplements do in the body, with evidence strength, quote and paper.
- Passed: Handshake
- Passed: Tools listed
- Passed: Updated recently
Median latency 699 ms · Last checked
Explore
Evidence for your next connection.
Independent measurements of remote MCP servers. Every observation has a timestamp.
Read-only probesMCP server · Other
Which loans fit a mobile home park: agency sizer, lot-rent valuation, program rules.
1 failed · 8 not measured
Median of successful probes over 7 days
Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.
Tool definitions returned by this server
Independent monitoring
Outdated check
Last connection measurement is over 24 hours old. Current availability is unknown.
Last checked| Test area | Passed | Failed | Unmeasured |
|---|---|---|---|
ConnectionCan a client connect and discover tools? | 5 | 0 | 0 |
Reliability & speedDoes it respond consistently and quickly? | 0 | 0 | 4 |
Access & authenticationWhat is required to use this server? | 1 | 0 | 2 |
Tool qualityAre the tool definitions usable by an agent? | 4 | 0 | 0 |
Publisher identityCan the publisher be traced to its source? | 3 | 1 | 2 |
Unmeasured means there is not enough evidence to decide. How these checks work
Start using Pad Count: mobile home park loan sizer
Choose your client, copy the configuration, then enable the server in your client’s MCP settings.
Run this command in your terminal, then restart Claude Code.
Claude Code
claude mcp add --transport http pad-count-mobile-home-park-loan-sizer https://mobilehomepark.loan/mcpCapabilities
The published rules for financing a mobile home park (manufactured housing community) under Fannie Mae MHC, Freddie Mac Optigo MHC, HUD Section 223(f) MHC and SBA 7(a)/504: max LTV, min DSCR, amortization, minimum size, occupancy, park-owned home caps, borrower eligibility, reserves and mortgage insurance, each with its primary source and date. SBA comes back as not eligible, with the SOP quote.
DiscoveredThe U.S. Census Bureau Manufactured Housing Survey average sales price of a new manufactured home, by month of shipment: single-section, double-section and all homes for the latest month published and the months before it. A yardstick for what filling a vacant pad with a new park-owned home costs.
DiscoveredRuns the Pad Count loan sizer on one mobile home park: for Fannie Mae MHC, Freddie Mac MHC, HUD 223(f) MHC and the user's own bank or CMBS terms it returns a verdict (fits, check first, doesn't fit), the loan amount (the smaller of value x max LTV and NOI / (coverage x loan constant)), which limit binds, the rate used (Treasury for the term plus a spread) and every published rule the park fails. SBA 7(a) and 504 come back as not eligible, with the SOP quote.
DiscoveredRuns the Pad Count lot-rent valuation worksheet: from pads, occupancy, lot rent, park-owned homes, other income and expenses it returns collected income, operating expenses, NOI, NOI from lots alone, value at the low, middle and high of a cap rate range the user supplies, value per pad, and the lender flags (85% occupancy, park-owned home share against the 25%/35% agency caps, pad minimums, Fannie Mae 5% economic vacancy floor, park-paid utilities).
DiscoveredRecent measurements
| Checked | Result | Response | Tools |
|---|---|---|---|
| Connected | 127 ms | 4 |