MCP HeartbeatTHE MCP OBSERVATORY
Public workspace

Explore

Evidence for your next connection.

Independent measurements of remote MCP servers. Every observation has a timestamp.

Read-only probes

MCP server · Code & DevOps

Zovo Project Timeline

A Gantt chart maker and project timeline planner that works inside the chat.

Checks passed
12 / 22

2 failed · 8 not measured

Median response
99 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
2

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Responded

The server completed its last measured handshake. This is an observation, not a guarantee.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
400
Publisher identityCan the publisher be traced to its source?
222

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 99 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-11-25, serverInfo.name gantt-timeline.

  • Pass
    Lists tools

    tools/list returned 2 tools.

  • Pass
    Current protocol

    Negotiated 2025-11-25. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 99 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 99 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Pass
    Parameters documented

    17 of 17 parameters have a description (100%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Not measured
    Website matches publisher

    This namespace is not a reverse domain, so the website comparison does not apply.

  • Fail
    Source repo linked

    No repository URL is on file.

  • Fail
    Repo owner matches

    The GitHub repository owner does not match the namespace login.

  • Pass
    Recently updated

    Updated 2026-10-22T05:43:32.533768Z, within 180 days.

  • Not measured
    Open-source licence

    No GitHub repository to ask about a licence.

Start using Zovo Project Timeline

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http zovo-project-timeline https://gantt-timeline.zovo.one/mcp

Capabilities

Tools 2

compare_timeline_scenarios

Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).

Discovered
plan_project_timeline

Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.

Discovered

Recent measurements

Probe history

View status
Latest stored probes. Raw probe rows are kept for 14 days.
CheckedResultResponseTools
Connected99 ms2