MCP HeartbeatTHE MCP OBSERVATORY
Public workspace

Explore

Evidence for your next connection.

Independent measurements of remote MCP servers. Every observation has a timestamp.

Read-only probes

MCP server · Code & DevOps

LeaseBreak

Estimate early lease termination costs, compare options and draft notice letters. Free.

Checks passed
14 / 22

0 failed · 8 not measured

Median response
62 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
4

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Responded

The server completed its last measured handshake. This is an observation, not a guarantee.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
400
Publisher identityCan the publisher be traced to its source?
402

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 62 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-11-25, serverInfo.name lease-break.

  • Pass
    Lists tools

    tools/list returned 4 tools.

  • Pass
    Current protocol

    Negotiated 2025-11-25. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 62 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 62 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Pass
    Parameters documented

    34 of 34 parameters have a description (100%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Not measured
    Website matches publisher

    This namespace is not a reverse domain, so the website comparison does not apply.

  • Pass
    Source repo linked

    A repository URL is on file.

  • Pass
    Repo owner matches

    The GitHub repository owner matches the namespace login.

  • Pass
    Recently updated

    Updated 2026-10-04T12:30:06.886964Z, within 180 days.

  • Not measured
    Open-source licence

    The GitHub licence lookup has not returned an OSI result yet.

Start using LeaseBreak

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http leasebreak https://lease-break.magicteams.ai/mcp

Capabilities

Tools 4

compare_options

Compare the net cost of breaking the lease vs subletting vs staying to term, ranked cheapest first with notes, risks and assumptions. Use when the user is deciding how to leave a lease. Do NOT use for the itemised break-cost breakdown alone - use estimate_break_cost.

Discovered
estimate_break_cost

Compute an itemised estimate of ending a lease early: notice-period rent, break fee, re-letting fee, rent until re-let, deposit credit and net cost vs staying. Use when the user asks what breaking their lease will cost. Do NOT use to weigh breaking vs subletting vs staying - use compare_options.

Discovered
negotiation_checklist

Build a checklist and step order for negotiating an early lease exit with the landlord, tailored to the break fee, months remaining, mitigation duty and local re-let demand. Use when the user wants to negotiate the fee down or plan the conversation. Do NOT use to compute costs - use estimate_break_cost.

Discovered
notice_letter

Draft a formal early-termination notice letter (text only - nothing is sent) with property, lease date, notice period, move-out date, fee and deposit lines, plus a subject and delivery tips. Use once the user has decided to leave early. Do NOT use to estimate costs - use estimate_break_cost.

Discovered

Recent measurements

Probe history

View status
Latest stored probes. Raw probe rows are kept for 14 days.
CheckedResultResponseTools
Connected62 ms4