MCP HeartbeatTHE MCP OBSERVATORY
Public workspace

Explore

Evidence for your next connection.

Independent measurements of remote MCP servers. Every observation has a timestamp.

Read-only probes

MCP server · Code & DevOps

Microsoft Project

Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.

Checks passed
4 / 6

0 failed · 2 not measured

Median response
Not measured

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
Not measured

No tool inventory recorded yet

Independent monitoring

Health & checks

Status history

Not measured

No usable connection measurement. Open the listing for details.

Last checked — not checked yet
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
005
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
003
Tool qualityAre the tool definitions usable by an agent?
004
Publisher identityCan the publisher be traced to its source?
402

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Not measured
    Reachable

    No remote endpoint to probe.

  • Not measured
    Valid handshake

    No remote endpoint to probe.

  • Not measured
    Lists tools

    No remote endpoint to probe.

  • Not measured
    Current protocol

    No negotiated protocol version.

  • Not measured
    HTTPS

    No endpoint URL is stored.

Performance

  • Not measured
    Fast (p50)

    No remote endpoint to probe.

  • Not measured
    Consistent (p95)

    No remote endpoint to probe.

  • Not measured
    Reliable (uptime)

    No remote endpoint to probe.

  • Not measured
    Stable tool list

    No remote endpoint to probe.

Access

  • Not measured
    Open access

    No remote tools/list to try without a credential.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Not measured
    Tools described

    No remote endpoint to list tools from.

  • Not measured
    Valid input schemas

    No remote endpoint to list tools from.

  • Not measured
    Parameters documented

    No remote endpoint to list tools from.

  • Not measured
    Safety hints

    No remote endpoint to list tools from.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Not measured
    Website matches publisher

    This namespace is not a reverse domain, so the website comparison does not apply.

  • Pass
    Source repo linked

    A repository URL is on file.

  • Pass
    Repo owner matches

    The GitHub repository owner matches the namespace login.

  • Pass
    Recently updated

    Updated 2026-10-20T14:25:58.301948Z, within 180 days.

  • Not measured
    Open-source licence

    The GitHub licence lookup has not returned an OSI result yet.

Start using Microsoft Project

Connect to this server

No remote connection configuration is available. Check the publisher’s repository for local installation instructions.

Capabilities

Tools

Tool definitions have not been recorded yet. A successful tool discovery is needed to show this server’s capabilities.

Recent measurements

Probe history

View status

No probe history recorded yet. Measurements will appear here after the server is checked.