MCP HeartbeatTHE MCP OBSERVATORY
Public workspace

Explore

Evidence for your next connection.

Independent measurements of remote MCP servers. Every observation has a timestamp.

Read-only probes

MCP server · Other

Energieausweis Express

Prepare a German Energieausweis (energy certificate); an Energieberater checks and signs it.

Checks passed
13 / 22

1 failed · 8 not measured

Median response
230 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
11

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Outdated check

Last connection measurement is over 24 hours old. Current availability is unknown.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
400
Publisher identityCan the publisher be traced to its source?
312

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 230 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-11-25, serverInfo.name energieausweis-express.

  • Pass
    Lists tools

    tools/list returned 11 tools.

  • Pass
    Current protocol

    Negotiated 2025-11-25. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 230 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 230 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Pass
    Parameters documented

    56 of 59 parameters have a description (95%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Pass
    Website matches publisher

    The website host matches the reverse-domain namespace.

  • Fail
    Source repo linked

    No repository URL is on file.

  • Not measured
    Repo owner matches

    This namespace is not an io.github login, so the owner comparison does not apply.

  • Pass
    Recently updated

    Updated 2026-10-31T06:22:46.717182Z, within 180 days.

  • Not measured
    Open-source licence

    No GitHub repository to ask about a licence.

Start using Energieausweis Express

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http energieausweis-express https://energieausweis-express.de/mcp

Capabilities

Tools 11

add_document

Uploads a file to a draft order: an energy bill or Heizkostenabrechnung (rechnung) or a photo (street side, heating, type plate). JPG, PNG, WebP or PDF as base64, at most 10 MB, 20 files per order. Bills are read and compared with the entered consumption after the customer has ordered; the Energieberater checks the photos. Usually the customer takes the photos on our page after the confirmation email. Orders nothing.

Discovered
answer_inquiry

Answers the open question (Rückfrage) about an ordered certificate with the customer's answers: values keyed by the item keys get_status listed, files the question asks for, and an explanation. Ask the customer first and send only what they confirmed.

Discovered
check_eligibility

Checks whether Energieausweis Express can issue a Verbrauchsausweis (consumption-based energy certificate) for a residential building in Germany, before any order exists. Returns yes or no with the reason in German (including the rule for houses with a Bauantrag before 1 November 1977 and the change on 1 January 2027), the all-inclusive price, the delivery time and what is needed. Changes nothing.

Discovered
find_building

Finds the building at a German address in our 3D building data. Returns the building at the address first, then nearby buildings, each with a building_ref for start_order and a short German description (type, storeys, footprint). If several addresses match, returns them instead: ask the user which one is meant. Where the address may be one of several buildings (semi-detached or terraced houses, several buildings on one plot), ask the user which is theirs. Changes nothing.

Discovered
get_certificate

Returns download links for the issued certificate and its invoice (PDF). The links work for one hour and open nothing else, so they can be shown to the user; call again for fresh ones. The customer also got both by email. Changes nothing.

Discovered
get_listing_facts

Returns what a property listing must state about the energy certificate (§ 87 GEG): type of certificate, Endenergieverbrauch, main energy carrier of the heating, year built and Effizienzklasse, as ready-to-paste German text. Only once the certificate is issued. Changes nothing.

Discovered
get_status

Shows where the order stands, in plain German words: prepared, ordered, being checked by the Energieberater, waiting for an answer to a Rückfrage (with its questions), issued. Changes nothing.

Discovered
request_confirmation

Sends the customer one email with a link to their prepared order on our website. This does NOT order or charge anything: the customer checks the data there, adds what is missing (usually photos of the street side and the heating) and orders and pays on our page themselves. Before calling it, ask the user for permission and tell them the price review_order returned and that they will get an email, e.g. 'Soll ich das für <Preis> bei Energieausweis Express vorbereiten? Sie bekommen dann eine E-Mail, prüfen alles und bestellen selbst.' Needs the customer's name, the email address they gave for this order, and who orders. One email per order plus one resend (e.g. to a corrected address); the link is valid for 7 days. Afterwards tell the user to look for the email with the subject 'Ihr Energieausweis ist vorbereitet – bitte prüfen und bestellen', also in the spam folder.

Discovered
review_order

Shows the order's data and what it still needs before the customer can order: the open points (which field to send, and in German why), whether a Verbrauchsausweis is possible, the price, and a preliminary result once the consumption is complete. Changes nothing.

Discovered
start_order

Starts a draft order for the building the user confirmed (building_ref from find_building). Orders and charges nothing. Returns order_id and order_token, which every later tool needs; the token opens only this order, so keep it private and never show it to anyone. Also returns what our 3D building model and the cadastre already say about the building (estimates the customer can correct) and the open points.

Discovered
update_order

Enters or corrects data of a draft order: facts about the building, the heating, and the consumption periods as printed on the bills, in the bill's unit (kWh; m3 of gas, with the bill's Brennwert and Zustandszahl; litres of oil; kg of pellets; we convert). The consumption is always the whole building's, also when the customer owns one flat: from a Heizkostenabrechnung take the Gesamtverbrauch der Liegenschaft, never the customer's own share. Send only what you know: fields left out stay as they are, and consumption.periods replaces all periods. Synonyms such as 'Gas' or 'heat pump' are accepted. Values are marked as entered by an assistant; the customer sees and confirms them before ordering. Returns the order as it is now and the open points. Orders nothing.

Discovered

Recent measurements

Probe history

View status
Latest stored probes. Raw probe rows are kept for 14 days.
CheckedResultResponseTools
Connected230 ms11