Findings on what compounds and supplements do in the body, with evidence strength, quote and paper.
- Passed: Handshake
- Passed: Tools listed
- Passed: Updated recently
Median latency 699 ms · Last checked
Explore
Evidence for your next connection.
Independent measurements of remote MCP servers. Every observation has a timestamp.
Read-only probesMCP server · Other
Dated European data-centre markets, grid connection restrictions, country rules and the live grid.
1 failed · 8 not measured
Median of successful probes over 7 days
Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.
Tool definitions returned by this server
Independent monitoring
Responded
The server completed its last measured handshake. This is an observation, not a guarantee.
Last checked| Test area | Passed | Failed | Unmeasured |
|---|---|---|---|
ConnectionCan a client connect and discover tools? | 5 | 0 | 0 |
Reliability & speedDoes it respond consistently and quickly? | 0 | 0 | 4 |
Access & authenticationWhat is required to use this server? | 1 | 0 | 2 |
Tool qualityAre the tool definitions usable by an agent? | 4 | 0 | 0 |
Publisher identityCan the publisher be traced to its source? | 3 | 1 | 2 |
Unmeasured means there is not enough evidence to decide. How these checks work
Start using DC Blueprint data-centre intelligence
Choose your client, copy the configuration, then enable the server in your client’s MCP settings.
Run this command in your terminal, then restart Claude Code.
Claude Code
claude mcp add --transport http dc-blueprint-data-centre-intelligence https://dcblueprint.com/mcpCapabilities
The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff cost, guarding, property tax, exit yield, grid wait, permitting and grid charges, with low and high. Needs a personal DC Blueprint key (Authorization: Bearer) from an account with a DC Blueprint licence or trial. Ask for one market for the project at hand: every figure costs 5 credits, one figure (the "figure" argument) 1; the same answer again in the calendar month costs nothing. It is not a way to copy the catalogue market by market. Markets: Amsterdam, Athens, Barcelona, Berlin, Copenhagen, Dublin, Frankfurt, Helsinki, Lisbon, London, Madrid, Milan, Oslo, Paris, Stockholm, Vienna, Warsaw, Zurich. Figures: Construction cost, Colocation price, retail, Colocation price, wholesale, Colocation price, large deals, Electricity price, Cost of a site employee, Guarding and monitoring, Property tax, Exit yield, Wait for a grid connection, Permitting, Grid connection charge, Customer substation.
DiscoveredDated overview of a European data-centre market: how many data-centre projects of 500 kW or more our pipeline tracker lists and how many are permitted or being built, the stated MW by stage on each capacity basis, who develops the most of them, whether new grid connections are paused, rationed or conditional in that country, the grid carbon intensity and power price this hour, and how many data-centre rules apply. Use for questions like "data centres in Germany", "Frankfurt data centre market", "who is building data centres in Spain". Metros: London, Frankfurt, Paris, Amsterdam, Dublin, Milan, Madrid, Zurich, Helsinki, Athens, Berlin, Lyon, Warsaw, Barcelona, Lisbon, Stockholm, Copenhagen, Oslo. Countries: United Kingdom, Germany, Italy, Spain, France, Finland, Netherlands, Ireland, Norway, Poland, Sweden, Greece, Switzerland, Denmark, Portugal, Belgium, Czechia, Croatia, Estonia, Romania, Austria, Lithuania, Hungary, Latvia.
DiscoveredThe national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with its status, who it applies to and the next date that matters, plus upcoming deadlines. Countries: Germany, France, Ireland, Netherlands, Italy, Spain, Sweden, Finland, Denmark, Poland, United Kingdom, Belgium, Czechia, Portugal, Switzerland, Norway, Greece, Austria, Hungary, Croatia, Lithuania, Latvia, Estonia, Romania, Bulgaria, Slovakia, Slovenia, Cyprus, Malta, Luxembourg, United States.
DiscoveredThis hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its rank among 15 markets. Without a market: all markets ranked cleanest first. Markets: Germany, United Kingdom, France, Netherlands, Ireland, Italy (North), Spain, Poland, Belgium, Austria, Switzerland, Norway (NO2), Sweden (SE3), Denmark (DK1), Finland.
DiscoveredWhere in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to and when it started. Without a country: the whole ranking. Use for questions like "where can I still connect a data centre to the grid in Europe", "is Ireland's grid moratorium still in force".
DiscoveredSearch DC Blueprint's pages: the four steps, the European market pages, the trackers (data-centre pipeline, grid connections, tenders, substation headroom), the Insights articles, the glossary, the operator pages and the facility pages. Returns up to 5 pages, best match first, with title, date, link and summary.
DiscoveredRecent measurements
| Checked | Result | Response | Tools |
|---|---|---|---|
| Connected | 388 ms | 6 |