DC Blueprint data-centre intelligence

Dated European data-centre markets, grid connection restrictions, country rules and the live grid.

Checks passed
13 / 22

1 failed · 8 not measured

Median response
388 ms

Median of successful probes over 7 days

30-day uptime
Not measured

Share of countable probes over 30 days, including daily rollups. Auth challenges are excluded.

Discovered tools
6

Tool definitions returned by this server

Independent monitoring

Health & checks

Status history

Responded

The server completed its last measured handshake. This is an observation, not a guarantee.

Last checked
Check summary by test group
Test areaPassedFailedUnmeasured
ConnectionCan a client connect and discover tools?
500
Reliability & speedDoes it respond consistently and quickly?
004
Access & authenticationWhat is required to use this server?
102
Tool qualityAre the tool definitions usable by an agent?
400
Publisher identityCan the publisher be traced to its source?
312

Unmeasured means there is not enough evidence to decide. How these checks work

Inspect individual checks 22 recorded

Core

  • Pass
    Reachable

    Latest probe returned HTTP 200 in 388 ms.

  • Pass
    Valid handshake

    protocolVersion 2025-11-25, serverInfo.name dcblueprint.

  • Pass
    Lists tools

    tools/list returned 6 tools.

  • Pass
    Current protocol

    Negotiated 2025-11-25. The bar is 2025-06-18 or newer.

  • Pass
    HTTPS

    The endpoint URL is https.

Performance

  • Not measured
    Fast (p50)

    Median latency 388 ms over 1 samples in 7 days. The bar is 1000 ms. Need at least 5 samples.

  • Not measured
    Consistent (p95)

    95th percentile 388 ms over 1 samples in 7 days. The bar is 3000 ms. Need at least 20 samples.

  • Not measured
    Reliable (uptime)

    1 of 1 attempts returned a tool list in 30 days (100%). The bar is 99%. Need at least 30 samples.

  • Not measured
    Stable tool list

    Fewer than two successful probes in 30 days, so tool-list stability is not measured.

Access

  • Pass
    Open access

    tools/list succeeded with no credential, and the record declares none.

  • Not measured
    Standard auth

    Auth is not required, so the OAuth metadata check does not apply.

  • Not measured
    Free tier cited

    No publisher quote has been checked.

Tools

  • Pass
    Tools described

    Every tool description is at least 20 characters.

  • Pass
    Valid input schemas

    Every inputSchema is a JSON Schema object.

  • Pass
    Parameters documented

    7 of 7 parameters have a description (100%). The bar is 80%.

  • Pass
    Safety hints

    Every tool sets readOnlyHint or destructiveHint.

Publisher

  • Pass
    Verified namespace

    Listed in the Official MCP Registry.

  • Pass
    Website matches publisher

    The website host matches the reverse-domain namespace.

  • Fail
    Source repo linked

    No repository URL is on file.

  • Not measured
    Repo owner matches

    This namespace is not an io.github login, so the owner comparison does not apply.

  • Pass
    Recently updated

    Updated 2026-10-31T15:28:57.102633Z, within 180 days.

  • Not measured
    Open-source licence

    No GitHub repository to ask about a licence.

Start using DC Blueprint data-centre intelligence

Connect to this server

Choose your client, copy the configuration, then enable the server in your client’s MCP settings.

Run this command in your terminal, then restart Claude Code.

Claude Code

claude mcp add --transport http dc-blueprint-data-centre-intelligence https://dcblueprint.com/mcp

Capabilities

Tools 6

business_case_figures

The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff cost, guarding, property tax, exit yield, grid wait, permitting and grid charges, with low and high. Needs a personal DC Blueprint key (Authorization: Bearer) from an account with a DC Blueprint licence or trial. Ask for one market for the project at hand: every figure costs 5 credits, one figure (the "figure" argument) 1; the same answer again in the calendar month costs nothing. It is not a way to copy the catalogue market by market. Markets: Amsterdam, Athens, Barcelona, Berlin, Copenhagen, Dublin, Frankfurt, Helsinki, Lisbon, London, Madrid, Milan, Oslo, Paris, Stockholm, Vienna, Warsaw, Zurich. Figures: Construction cost, Colocation price, retail, Colocation price, wholesale, Colocation price, large deals, Electricity price, Cost of a site employee, Guarding and monitoring, Property tax, Exit yield, Wait for a grid connection, Permitting, Grid connection charge, Customer substation.

Discovered
data_centre_market_overview

Dated overview of a European data-centre market: how many data-centre projects of 500 kW or more our pipeline tracker lists and how many are permitted or being built, the stated MW by stage on each capacity basis, who develops the most of them, whether new grid connections are paused, rationed or conditional in that country, the grid carbon intensity and power price this hour, and how many data-centre rules apply. Use for questions like "data centres in Germany", "Frankfurt data centre market", "who is building data centres in Spain". Metros: London, Frankfurt, Paris, Amsterdam, Dublin, Milan, Madrid, Zurich, Helsinki, Athens, Berlin, Lyon, Warsaw, Barcelona, Lisbon, Stockholm, Copenhagen, Oslo. Countries: United Kingdom, Germany, Italy, Spain, France, Finland, Netherlands, Ireland, Norway, Poland, Sweden, Greece, Switzerland, Denmark, Portugal, Belgium, Czechia, Croatia, Estonia, Romania, Austria, Lithuania, Hungary, Latvia.

Discovered
data_centre_rules

The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with its status, who it applies to and the next date that matters, plus upcoming deadlines. Countries: Germany, France, Ireland, Netherlands, Italy, Spain, Sweden, Finland, Denmark, Poland, United Kingdom, Belgium, Czechia, Portugal, Switzerland, Norway, Greece, Austria, Hungary, Croatia, Lithuania, Latvia, Estonia, Romania, Bulgaria, Slovakia, Slovenia, Cyprus, Malta, Luxembourg, United States.

Discovered
grid_carbon_and_price_now

This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its rank among 15 markets. Without a market: all markets ranked cleanest first. Markets: Germany, United Kingdom, France, Netherlands, Ireland, Italy (North), Spain, Poland, Belgium, Austria, Switzerland, Norway (NO2), Sweden (SE3), Denmark (DK1), Finland.

Discovered
grid_connection_status

Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to and when it started. Without a country: the whole ranking. Use for questions like "where can I still connect a data centre to the grid in Europe", "is Ireland's grid moratorium still in force".

Discovered
search_dcblueprint

Search DC Blueprint's pages: the four steps, the European market pages, the trackers (data-centre pipeline, grid connections, tenders, substation headroom), the Insights articles, the glossary, the operator pages and the facility pages. Returns up to 5 pages, best match first, with title, date, link and summary.

Discovered

Recent measurements

Probe history

View status
Latest stored probes. Raw probe rows are kept for 14 days.
CheckedResultResponseTools
Connected388 ms6